# Switching Co-Packers: A Workable Checklist for Process Transfer

Switching a co-packer is not as simple as sending the formula. The same formula on a different extrusion line can shift bulk density, moisture, color and pellet length, and palatability can follow.

A sloppy transfer usually looks like this: batch one passes, batch two starts drifting, batch three brings complaints. Here is a checklist that avoids that sequence.

1. When a switch makes sense

  • The current line cannot run the new format, for example moving from extrusion to baking or from dry to wet.
  • Lead times have missed target for three consecutive months.
  • Quality incidents repeat and corrections do not hold.
  • The cost structure has clearly lost competitiveness.
  • Single-plant risk is too high, whether from regional concentration or capacity absorbed by larger customers.

Not every problem deserves a switch. Check scheduling before blaming lead time, and check the quote structure before blaming cost.

2. The handover pack: six items

1. **Formula sheet**: ingredient specs, inclusion rates, allowed tolerances.

2. **Process parameters**: temperature zones, screw configuration, die plate, drying curve, cooling conditions, coating rate.

3. **Packaging specification**: material structure, thickness, wind direction, print colors, sealing parameters.

4. **Test methods**: how bulk density, moisture, protein, fat, pellet length and hardness are actually measured.

5. **Label and filing information**: current version, ingredient list, nutrition panel, filing number.

6. **Historical batch data**: at least three months of inspection records and complaints.

Item four is the most commonly skipped. Without a shared test method, the two plants report numbers that cannot be compared.

3. Verification: three consecutive batches

  • **Batch 1**: small trial, checking whether the process runs and the equipment holds.
  • **Batch 2**: scale to target volume, checking consistency.
  • **Batch 3**: run at normal scheduling rhythm, checking stability.

Compare across all three: bulk density, moisture, pellet length, color, hardness and palatability, the last through a small feeding test. Release volume only after all three hold.

4. Handling drift

  • **Bulk density off**: check die plate and screw configuration first, then ingredient particle size.
  • **Moisture high or low**: check the drying curve and cooling time before touching the formula.
  • **Color difference**: check ingredient batch and coating rate, and consider drying temperature.
  • **Palatability down**: suspect fat coating uniformity and the flavor application point first.
  • **Hardness changed**: check expansion degree and final moisture after drying.

Order matters: process first, ingredients second, formula last.

5. Old packaging and stock

  • Count old packaging stock and schedule what can be consumed into transition production.
  • Scrap or revise the remainder; never let two versions circulate in the channel.
  • Count finished goods too, so old and new batches are not shipped mixed and do not generate complaints.

6. Dual supply during the transition

  • Run a one to three month dual-supply window while the new plant ramps.
  • Code batches from each plant separately, and allocate shipments by channel.
  • Before ending dual supply, hold a comparison review: quality, lead time and cost must all clear the bar.

7. What the agreement should say

  • The handover document list and confidentiality obligations.
  • The number of verification batches and acceptance criteria.
  • How drift is attributed and who pays.
  • Supply assurance and remedies during the transition.
  • Ownership of formula and process documents.

On transfer projects, Mixiaoqi pet food OEM/ODM holds a parameter alignment meeting first, walking through each test method side by side. Once the methods match, the three-batch verification starts.

FAQ

**Q1: What gets missed most often in a co-packer switch?**

Process parameters and test methods. The formula arrives, but temperatures, screw configuration, drying curves and test methods do not, leaving the new plant to guess.

**Q2: How many batches should verification cover?**

Three consecutive batches, comparing bulk density, moisture, color, pellet length and palatability, with volume released only after all three hold steady.

**Q3: How should old packaging be handled?**

Count stock first, schedule what can be consumed into transition production, and scrap or revise the rest so two versions never circulate in the channel at once.